Your monthly update on innovation and deployment for Europe’s railway system of the future.At its 18th meeting, the...
Requirements for network management functionality (in contrast to communication functionality) and concrete list of management functionality that shall be in scope of further specification.
Provision of a business case outline document based on lessons learned and best-practices research in Europe
Architecture and interfaces of the Integration Laboratories, tool capabilities, format of test script.
Analysis of ATO benefits over a selection of KPIs comparing runs conducted in manual and automatic driving.
Analysis of performed integration activities including functional requirement specifications, interfaces, test plan and test report.
Autonomous movement of tramways in depot demonstrator
Results of the autonomous movement of tramways in depot demonstrator
This deliverable includes the update of the Hybrid Level 3 specification based on feedback from the prototype development and the results of Task 16.2
This deliverable includes the update of the Moving Block specification based on feedback from the prototype development and the results of Task 14.4
Report on the intermediate system baseline for R2DATO technologies.
Verification of Perception system applicability in real environment by means of a PoC in field environment.
This deliverable will describe the test plan and result obtained during validation activities