Rail JU logo in white
European Union flag

A body of the
European Union

FP2 – R2DATO

Deliverables published by the project

D25.4 – Isolation requirements for simultaneous operation of RMR and MNO services

Develop Onboard antenna and track-side prototypes with lab experimental results.

D37.5 – Assessment of ETCS HL3 deployment report

Report on the results from the assessment of ETCS HL3 deployment following the developments from previous tasks.

D35.3 – Analysis Tools specification

Specification of the analysis tools to apply common methods for interpreting results

D33.2 – Practical Migration Methods Report

Summary of development methodologies

D32.4 – ATO Human Factors Impact Assessment Analysis Report

HF research dedicated to ATO operations report, including guidelines for human-in-the-loop assessment simulations and best practices

D30.3 – ERTMS L3 trackside with moving block formalisation (TRV)

This deliverable will provide a reference model of L3 trackside with moving block, as a digital twin (execution in lab) enabling both system and safety engineers to execute and analyse a common system model. This will demonstrate the applicability of formal methods for automated authorisation applied to ERTMS L3

D30.2 – Validation approach based on a hybrid testbed to perform X-in-the-loop testing

This deliverable will propose an approach based on a hybrid testbed to perform X-in-the-loop testing and check the conformity of requirements of EULYNX implementations against the SysML-based specification models. This deliverable will serve as a basis to enable automated authorisation.

D30.1 – Automatic transformation, means of verification and validation (V&V), and traceability between models using different modelling approaches

This deliverable will develop a methodology and a corresponding toolchain that achieve the formalisation of SysML models and their contribution to the authorisation process. A proposed procedure for the traceability of a baseline and refined EULYNX specification model will be demonstrated in the form of a prototype. The connection of the MBSE approaches used in the ERJU System Pillar will be defined and described as a unified workflow.

D27.5 – Digital Register Object Catalogue for the Data Factory

In this deliverable, the performed Digital Register Object Catalogue, as needed for the Data Factory will be made publicly available, incl. detailed object classes, attributes and descriptions

D27.5 – Digital Register Object Catalogue for the Data Factory

In this deliverable, the performed Digital Register Object Catalogue, as needed for the Data Factory will be made publicly available, incl. detailed object classes, attributes and descriptions

D27.3 – Updated requirements and specification of the Digital Register

This deliverable will contain an updated set of requirements and specifications related to the Digital Register, incorporating findings from the Digital Register implementation and its usage in the R2DATO demonstrators.

D24.2 – Network management specification and realized selected proof-ofconcepts for T24.2

Specification for the network management functionality of Onboard Communication Network (aka One Common Bus) and documentation of the realized proof-of-concepts for network management

No results found.

Europe's Rail