FP2 R2DATO D36.2: Demonstrator Implementation Phase 1 Concluded and Test Results Consolidated. D36.2 summarises the...
FP2-R2DATO project plan for 2025
- Demonstrate technical and functional enablers such as ATO GoA3/4 over mixed radio based ETCS levels (TRL7), Hybrid Level 3, moving block and TIMS (TRL6/7), connectivity (TRL6), perception (TRL5/6), train positioning (TRL5/6), automated functions and digital register (TRL6).
- Demonstration of the remote driving and command in depots and yards, including perception systems (TRL5/6).
- A first demonstrator on next generation ATC, with modular onboard and trackside ATC architectures, at proof-of-concept stage, in close collaboration with the EU Rail System Pillar.
- A proof-of-concepts and/or validation in laboratory and field (i.e., up to TRL5 in Lab and TRL6 on site) for the following new functions and technical enablers:
- Virtual Coupling Train Set (TRL4/5)
- Self-driving wagon (TRL4/5)
- autonomous path allocation (linked to input from Flagship Area 1)
- validation and certification (TRL6)
- Demonstrate a Functional Open Coupling System prototype covering all required subsystems in an operational environment (TRL7)
- Demonstrate a modular hardware platform using architectural software design patterns and methods (TRL5/6) allowing SIL2 respective SIL4 (depending on the application)