Rail JU logo in white
European Union flag

A body of the
European Union

FP2 – R2DATO

Deliverables published by the project

D15.1 – HL3 System Specification

This document summarises the HL3 system specification, HL3 use cases and engineering rules.

D36.2 – Demonstrator implementation phase 1

Sorry, but you do not have permission to view this content.

Please contact the administrator in order to access this page.

D4.1 – Automation Processes Collaboration Map

This deliverable will provide a comprehensive list of interfaces and exchanged items between this subproject and other internal and external stakeholders.

D41.2 – Testing reports & assessment

Results of the remote driving of tramways demonstrator.

D6.6-Specification autonomous operations for tramways

This deliverable will contain a collection of use cases to be covered by the envisioned and detailed list of functions and the system requirements of autonomous trams both in depot and in operation.

D27.2 – Specification of the Digital Register implementation(s) required in FP2- R2DATO

In this deliverable, all concrete Digital Register implementations that will be needed for different demonstrators, and for other Technical Enablers such as Data Factory, will be specified.

D26.1 – High-level consolidation

This deliverable will provide a high level consolidation of the prior work related to Modular Platforms and will capture the agreements of the partners regarding which aspects related to Modular Platforms will be specified within R2DATO.

D26.2 – Intermediate Modular Platform requirements, architecture and specification

This deliverable will capture an intermediate stage of the derived requirements on Modular Platforms, and the derived architecture and specification, for instance serving as input to the Onboard Platform Demonstrator in WP 36.

D27.1 – Set of requirements on the Digital Register in R2DATO

In this deliverable, all functional and non-functional requirements on the Digital Register, as needed by the various parts of the rail system developed in R2DATO, will be captured.

D36.1 Demonstrator specification

Detailed specification of the demonstrator, incl. requirements, logical and physical architecture, implementation plan, etc.

D22.7 –Assessment of the need for an early EGNOS service

This document will present the assessment of the need for an early EGNOS service.

D5.2 Documentation of use cases for Perception system

This deliverable will provide a list of use cases and their expected behaviour which in turn will be translated to develop the requirements for the Perception system required for Automatic Train Operation in Mainline/Regional Line/Stabling & Shunting, Freight and Urban/Light Rail applications.

No results found.

Europe's Rail