Women continue to be significantly underrepresented in the railway workforce, accounting for only around 23% of the...
The present document constitutes the Deliverable D8.2 “Developed methods and models for evaluating feedback loops between planning and operations” in the framework of the Flagship Project FP1-MOTIONAL as described in the EU-RAIL MAWP. The overall objective of this task is to develop and improve railway traffic simulation methods and models to improve feedback loops between planning and operations. With better modelling of the traffic, we can achieve more reliable and effective evaluation of capacity and punctuality, which can be used to increase the quality of the plan.
In this deliverable, development is presented related to four demonstrations, i.e., demonstrations 9.1–9.4. Also, demonstration 9.8 is presented briefly, even though the main developments there are presented in Deliverable D8.3 (FP1–MOTIONAL,2025). Results of the Deliverable D8.2 are:
Main conclusions are that there is a need for further developments within railway traffic simulation modelling. The more we know about setup of simulations, the faster we can do efficient analyses. With the development presented in this deliverable, we are able to perform better traffic and capacity analyses and give more relevant feedback to planning. Improved input data and stochastic disturbances that are presented in the deliverable will make the results more reliable.