Rail JU logo in white
European Union flag

A body of the
European Union

FP6 – FUTURE

D4.1 – Requirement specifications for Wayside Assets Report

The present document represents the Deliverable D4.1 with the title “Requirement Specification for Wayside Assets Report”. This primary objective of this Deliverable is to outline a set of requirements that reflect the operational and functional behaviour of three...

D5.1 – State-of-the Art Report for regional lines rolling stock

This deliverable will provide, as specified in the Grant Agreement: • A comprehensive report on requirement specification for rolling stock with a particular focus on mechanical architecture, mechanical parts, TCMS, traction/propulsion, modular interior, and train...

D5.2 – Specifications CCS for Group 2

Group 2 Regional Lines (G2 Lines) are lines or network of lines that are not functionally/operationally connected with the mainline network (ER JU Multi Annual Work Programme and Article 1.3 (c) of the EU Interoperability Directive [8]). Group 2 regional rail is...

D2.3 – FIRST RELEASE OF KPI ACHIEVEMENT

The present document constitutes the Deliverable D2.3 “First release of KPI achievement” in the framework of the Task 2.3 of the WP2 of FP6 – FutuRe project. This document has the following goals: • to collect and sort the SEOs and KPIs relevant for the FutuRe...

Europe's Rail