Rail JU logo in white
European Union flag

A body of the
European Union

FP5 – TRANS4M-R - Project Outputs

D29.7 Execution of test for gates installed in the Netherlands

Oct 16, 2026

Output type:

Deliverable (D) 29.7: “Execution of test for Gates in the Netherlands” contains the results of the tests as described in deliverable (D) 29.4: Installation and test plan for Gates in the Netherlands as made by the Netherlands (ProRail/University of Twente). The aim of the tests was to assess the Video Gates and software build in the Dutch Railroad infrastructure, and this deliverable describes the results of the test.  

This document was created by experts from ProRail (Dutch Railway Company) and the University of Twente. The aim of this deliverable is to describe how the tests were conducted and to evaluate whether the test objectives regarding the physical requirements for the Video Gates, as well as software aspects, have been achieved. The test designs follow the requirements defined in Deliverable 25.1 [D25.1]. Performance metrics were defined for each requirement and the tests were conducted with those criteria in mind. 

This deliverable is the result of the research done and describes the results and outcomes of the tests. 

Europe's Rail