FP2 R2DATO D36.2: Demonstrator Implementation Phase 1 Concluded and Test Results Consolidated. D36.2 summarises the...
FP5-TRANS4M-R project plan for 2025
- Demonstrate DAC Level 4 (functional) and level 5 ready couplers for testing on train lab and for largescale demonstrators (TRL 8)
- Demonstrate locomotive hybrid-coupler and Wagon DAC for special wagons for testing on trains lab and largescale demonstrators (TRL 8)
- Interoperable power supply and communication system for Locomotives and wagons (TRL 8)
- Operational procedures and harmonization
- Train functions
- Train composition detection (train inauguration) (TRL 8)
- Automated brake test (TRL 8)
- Automatic coupling and uncoupling (controlled from a locomotive) (TRL 8)
- Train integrity monitoring and train length determination (TRL 7)
- Automated parking brake control function (controlled from locomotive) (TRL 7)
- Distributed Power System – DPS (TRL 7)
- Train brake control & monitoring (via train network parallel; EP-Brake) (TRL 7)
- Consolidated Full System Integration plan, test concept & Validation Concept and Plan
- Authorization, safety analysis and DAC Running Safety Assessment Tool
- Definition of use cases and conceptual system specification for self-propelled wagon
- Requirements Specification Yard Automation for Hump Yard and Flat/Last Mile Yard
- Demonstrate flat yard/ last mile yard automation and management and Hump YAMS
- Provision of effective intermodal prediction algorithms based on AI models to boost decision making performance (TRL 7)
- Development of the functions, tools or supporting systems ensuring a seamless planning (end-to-end) (TRL 6-7)
- Harmonised real-time interface between Railway Traffic Management System and the yard/terminal management systems to dynamically adapt planning and tasks (TRL 6-8)
- Enabling improved cross-border operations through the use of Standardised European Railway Checkpoints, including the deployment of innovative technologies such as Intelligent Video Gates (TRL 8)
- Integration of multimodal services for harmonized transport planners with booking support functions (TRL 7)