Rail JU logo in white
European Union flag

A body of the
European Union

Deliverable

D24.1 Preparation of standardisation and demonstration

Deliverable D24.1 documents the work carried out within WP24 – Preparation of demonstration and standardisation for seamless freight – which provides the foundation for the coordinated execution of the Seamless Freight demonstrations in WP33 (Showcase Seamless...

D33.1 Integration of network management use case with Destination FA1

This deliverable reflects the objectives of WP33, where seamless corridor operations will be demonstrated and validated by integrating physical and information flows within Destination 5. The report is an output of Work Package 33 (WP33) within the Flagship Project 5...

D29.7 Execution of test for gates installed in the Netherlands

Deliverable (D) 29.7: “Execution of test for Gates in the Netherlands” contains the results of the tests as described in deliverable (D) 29.4: Installation and test plan for Gates in the Netherlands as made by the Netherlands (ProRail/University of Twente). The aim of...

D29.5 Execution of test for gates installed in Sweden

This deliverable, D29.5 “Execution of Test for Gates Installed in Sweden” addresses the execution of tests for gates installed in Sweden in relation to Task 29.2: Demonstration and evaluation of the installed checkpoints within WP29 – European Railway Checkpoints...

Europe's Rail