Rail JU logo in white
European Union flag

A body of the
European Union

Deliverable

D5.1 – State-of-the Art Report for regional lines rolling stock

This deliverable will provide, as specified in the Grant Agreement: • A comprehensive report on requirement specification for rolling stock with a particular focus on mechanical architecture, mechanical parts, TCMS, traction/propulsion, modular interior, and train...

D5.2 – Specifications CCS for Group 2

Group 2 Regional Lines (G2 Lines) are lines or network of lines that are not functionally/operationally connected with the mainline network (ER JU Multi Annual Work Programme and Article 1.3 (c) of the EU Interoperability Directive [8]). Group 2 regional rail is...

Deliverable D27.1 Dynamic Dispatching – Cartography

Overall objective of WP 27 is to identify, coordinate and describe dynamic dispatching requirements and constraints that are specific to last-mile operations in terminals/yards, such as terminal operations, optimized loading and unloading in relation to real-time...

Europe's Rail