Rail JU logo in white
European Union flag

A body of the
European Union

FP6 – FUTURE - Project Outputs

D4.4 – SWOC LX Solution for Multimodality Report

Dec 15, 2025

Output type:

The primary objectives of D4.4 are to outline a set of requirements and architectures that reflect the operational and functional behaviour when deployed at Regional Lines for:
1 – Smart Wayside Object Controller (SWOC) Multi Modal Level Crossing (MMLX) top functionality for G1 and G2 lines.
2 – SWOC MMLX Business model study.
3 – SWOC MMLX Use cases. These use cases are also applicable to task 4.2.
In addition to specifying requirements, D4.4 parts (documents) also include analysis and investigations of new interfaces and business cases.
This document provides sections describing the process used to derive (a) the architecture from the requirements, (b) the requirements from the Use Cases and (c) it also describes how the requirements are managed.
The linked parts (documents) discuss the social-economic benefits targeted by the requirements and architecture specifications. FP6 FutuRe project has accepted the lack of cost baselines from infrastructure managers, thus D4.4 cost reduction proposals may need to be verified in the future.

Europe's Rail