The January 2025 edition of the Europe’s Rail newsletter is out! We are happy to unveil our completely new design,...
List of Technical Enablers
To achieve the operational outcomes targeted in this Flagship Area, several technical capabilities were identified by FP6. To develop flagship demonstrations, some functions must be delivered with enough maturity, with a target TRL indicated for each enabler.
Enabler 1 | Interlocking / RBC for regional lines |
Enabler 2 | Cost-effective communications |
Enabler 4 | ATO over ETCS adapted to regional operationsHybrid L3, moving block Traffic Management Systems and C-ITS for regional lines Cost-effective fail-safe highly accurate train positioning Cost-effective fail safe on Board Train integrity Cost-effective fail safe Train Length Detection Wayside elements for regional railways which are energy self-sufficient and/or wireless enabled Smart Wayside Object Controller (SWOC) New propulsion train refuelling /recharging station Virtualisation in Rolling Stock design |
Enabler 5 | Cost-efficient Rolling Stock system design |
Enabler 6 | Passenger Information System |
Enabler 7 | Congestion Rate Monitoring and flow optimisation |