Rail JU logo in white
European Union flag

A body of the
European Union

FP3 – IAM4RAIL - Project Outputs

Deliverable D2.1 Architecture Input Requirements Consolidation, first version

Oct 6, 2025

Output type:

This document, deliverable D2.1 Architecture Input Requirements Consolidation first version in FP3‐IAM4RAIL, outlines a high‐level system architecture aligned with EU RAIL Multi‐Annual Work Programme (MAWP). The Scope of D2.1 is to define a first issue for the definition of FP3‐IAM4RAIL project architecture, including a description of innovation and an introduction to the business assessment.

This first definition will cover how the proposed developments go beyond the state‐of-the‐art, including the current architecture of the systems, and a high‐level architecture overview of the proposed demonstrators constituting building blocks which will be built up into a holistic approach in D2.3 Architecture Requirements Consolidation final version.

Europe's Rail