Rail JU logo in white
European Union flag

A body of the
European Union

FP1 – MOTIONAL - Project Outputs

D5.1 Demonstrator Report – Integration of planning systems and processes including cross-border planning

Mar 17, 2026

Output type:

Deliverable D5.1 “Demonstrator report – Integration of planning systems and processes including cross-border planning”

This deliverable presents the validation and evaluation of the seven WP5 demonstrations, which aim to reach the target TRLs needed to verify the goals of WP4 and WP5. Regular dialogue with the System Pillar and RailNetEurope (RNE) supported the work, with a special focus on the Malmö–Oslo/Alnabru corridor, covered by demonstrations in FP1 WP5, WP12 and FP5. All WP5 demonstrations aim to improve planning and communication when new information, such as ad hoc train paths, updated arrival/departure times, TCRs or other changes, must be transferred between PCS, CMS and TMS locally, nationally and internationally. Key FP1 results from each demonstration are outlined. Overall, D5.1 validates an interface solution that communicates cross-border train paths between PCS and CMS, and shows that cross-border train paths can be generated using residual capacity.

 

Europe's Rail