Digital Twin Design-time environment
Project: FP1 - MOTIONAL (01/12/2022 - 30/09/2026)

Work Packages

Currently available work packages:

WP27 Digital Asset Engineering (Multidisciplinary Process)

This WP aims to digitise and automate the whole planning phases to ease engineering work, reduce costs of development and testing, and reduce time to deployment. Replacing paper as common-used exchange of information in planning CCS assets by digital format will be one of the main focuses. The automated planning of ETCS L2 and LR implementation will be based on harmonised EU planning and engineering rules related to the track layout instead of legacy signalling planning rules (green field planning approach) synchronized also with the SP work on standardized engineering and planning rules). The EULYNX Data model being the CCS+ related domain model of CDM (Conceptual Data Model) or its newer releases coming from the System Pillar (see LinX4Rail project and EU-RAIL System Pillar) will be applied for 5 reference planning projects, preferably along EU TEN corridors (e. g. ScanMed).

Public Deliverables

Currently available deliverables:

D27.1 Data model and format for a harmonised EU planning of railway assets, starting from CCS+
D27.3 Digital assets engineering reference demonstration outcomes
D27.4 Guidelines and specifications for developing and maintaining Digital Twin