Rail JU logo in white
European Union flag

A body of the
European Union

Technical enablers

TE19 Enabler 19

Harmonised interfaces between rail operators and other transport modes, leveraging existing European standards when applicable to enhance collaboration between mobility providers and support B2B integration including the objective to deliver an enhanced end-user experience. The TRL 5 developments within this WP will be based on the specifications and analysis done in WP19. Within this WP TRL5 will be reached in order to be used for the demonstrators.
Project: FP1 - MOTIONAL (01/12/2022 - 30/09/2026)

Work Packages

Currently available work packages:

WP21 Demonstration: Integrate Rail with other transport modes

The results of the analysis of available data (WP19) and detailed description of technical developments (WP20) are used for this demonstration WP. Focus of this WP is to reach TRL 6-7 for Enabler 18 ( Improved rail integration using B2B intermodal services) and TRL 7-8 for Enabler 19 (Harmonised interfaces between rail operators and other transport modes). The objectives of this WP are to:
  1. Set the demonstrations (selection of demonstration place, definition of installation work and required data, requirements on enablers, user journey, monitor timelines, covering the testing strategy for all demonstrations planned for this WP)
  2. Execution of the demonstration (preparation, installation, dry-run, execution, collection of results
  3. Documentation and assessment of results and preparatory work for upcoming EU projects (according to MAWP) All objectives are aligned with the plans and strategies developed in WP2

Public Deliverables

Currently available deliverables:

D21.2 Integrate Rail with other transport modes – Analysis and assessment of Demonstration Results

All deliverables, results and publications herewith provided reflects only the author's view and the EURAIL is not responsible for any use that may be made of the information it contains.

Europe's Rail