Europe’s Rail Joint Undertaking (JU) is pleased to announce the launch of its Call for Proposals 2025-02, with a total...
TE02 Enabler 2

Work Packages
Currently available work packages:
WP03 Specifications of demonstrators for improved strategic and tactical planning of the rail network
The objectives of this work package are to align, prepare and deliver the high-level (Workstream 1.1) specifications of requirements, high- level design and high-level use cases for development of the Technical Enablers 1 to 7.
WP04 Development – Integration of planning systems and processes including cross-border planning
- Enabler 1: European cross-border scheduling with international train path planning [TRL6/7]
- Enabler 2: Improved capacity allocation using rolling planning and TTR [TRL6/7]
- Enabler 6: Integration of planning systems and TMS with a) yard capacity planning and b) station capacity planning [TRL5/6]
WP05 Demonstration – Integration of planning systems and processes including cross-border planning
The overall objective of WP5 is to demonstrate and further develop the demonstrator modules in WP5, to ensure to reach the target TRLs that allow the verification of the achievement of the goals of WP4 and WP5.
Public Deliverables
Currently available deliverables:
This document constitutes the Deliverable D3.1 “Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high-level design for demonstrators in WPs 4-9” in the framework of the Flagship Project FP1-MOTIONAL.
The objective of this deliverable is to align, prepare and deliver the high-level specifications of requirements, high-level design, and high-level use cases for the development of the technical enablers 1 to 7. The high-level specification is done in parallel with more detailed specifications from WP4, WP6 and WP8. Participants from all WPs contributed to the texts.
In the project proposal, seven technical enablers were linked to Workstream 1.1 (Planning work packages), i.e., WP4/WP5 (Integration of Planning Systems and Processes), WP6/WP7 (Decision Support and Optimization) and WP8/WP9 (Simulation and Operational feedback). Here, each of the technical enablers are described in detail, including alignment with previous results, current state of practice, assigned development needs and high-level requirements.
An extensive mapping is also a result that is presented in this deliverable. All demonstrators (that further on will be called demonstrations) in Workstream 1.1 are introduced and described, together with related use cases. There are 13 demonstrations and they are all mapped against technical enablers, TRL levels, use cases and the high-level requirements defined for each technical enabler. They are also mapped against simulation environments and frameworks to be used within WP4/WP5, WP6/WP7 and WP8/WP9. Finally, the alignment and interactions between WP4-WP9 demonstrations and other FA1 WPs, other Flagship Projects and SP Task 3 CMS/TMS and RNE are mapped.
All deliverables, results and publications herewith provided reflects only the author's view and the EURAIL is not responsible for any use that may be made of the information it contains.