Europe’s Rail Joint Undertaking (JU) is pleased to announce the launch of its Call for Proposals 2025-02, with a total...
Deliverable D 6.1 User and functional specifications for multi-purpose resilient adaptative on-board telecom networks
Train services is mainly composed of two main areas, namely Train Control and Monitoring System (TCMS) and On-board Multimedia and Telematics (OMTS). TCMS is responsible of the integration of train functionalities such as braking, commands and others. Whereas OMTS...Deliverable D2.1 Architecture Input Requirements Consolidation, first version
This document, deliverable D2.1 Architecture Input Requirements Consolidation first version in FP3‐IAM4RAIL, outlines a high‐level system architecture aligned with EU RAIL Multi‐Annual Work Programme (MAWP). The Scope of D2.1 is to define a first issue for the...Deliverable D1.5 Technical/Impact KPIs Report (initial)
This document, “Technical/Impact KPIs Report (inital)”, explains how FP3-IAM4RAIL is addressing the Key Performance Indicators (KPIs) stated in the Muli-Annual Work Programme (MAWP) of the EU-Rail JU, the Performance Indicators (PIs) to be fulfilled...Newsletter 21 – FP3-IAM4RAIL Work Package 9: Railway Infrastructure
WP9 Railway Infrastructure develops cutting-edge solutions for the design, monitoring, and maintenance of railway infrastructure. Using wayside, onboard, and crowd-based sensing combined with advanced analytics, WP9 delivers practical anomaly detection solutions,...