Project objectives
The main purpose of this project is to validate the FRMCS V2 Specifications & V3 target requirements with precommercial FRMCS system components in realistic operational conditions and to feed-back the result to the railway eco-system in order to timely start the migration to FRMCS across the European railway system.
Objective 1: Provide a future proof FRMCS architecture with the necessary telecommunication elements
- 5G SA (Stand Alone) architecture (core and access);
- IMS/SIP-core and MCX;
- TOBA (Telecom On-Board Architecture) equipment;
- Track Side Gateway;
- Cab radio equipment (: Voice Application Subsystem (VAS));
- Dispatcher;
- Monitoring equipment (system and radio);
- ETCS / ATO / TCMS simulators compatible with FRMCS interfaces, including (ETCS) PKI and KMS (national and international), based on H-2-N.
Objective 2: Test the necessary functions of the FRMCS V2 set of specifications
- Voice functions for both drivers and controllers;
- Railway Emergency Communication – REC (Combined REC alert and REC voice);
- Data functions (including ETCS, ATO and TCMS applicative simulations);
- Combination of voice and data applications;
- Location and positioning service (e.g., Railway Emergency Communication, driver to controller communications based on driver’s location) and internal FRMCS System usage (e.g., FRMCS domain change);
- Time service (e.g. timestamp for location reporting of REC);
- Usage of various frequencies: RMR bands (900 and 1900 MHz) and some MNO band(s);
- FRMCS multipath concepts using data paths of MNO and FRMCS/RMR;
- FRMCS inter-domain transition and cross-border testing;
- FRMCS domains interconnection (e.g., communications between users served by different FRMCS Service Domains);
- GSM-R / FRMCS interworking and transition;
- Interoperability between FRMCS components from various manufacturers;
- Quality of Service with performance measurements at system and radio levels;
- Cybersecurity (elements of).
Objective 3: Validation and return on experience
- Provide material elements to confirm / correct / amend / evolve the FRMCS V2 set of specifications;
- Communicate these elements to the UIC FRMCS Programme for the closing of FRMCS V3 set of specifications ahead of update of CCS TSI,