How can we build on the progress made so far to make rail travel truly accessible, affordable and reliable for...
Project objectives
The main purpose of this project is to validate the FRMCS V2 Specifications & V3 target requirements with precommercial FRMCS system components in realistic operational conditions and to feed-back the result to the railway eco-system in order to timely start the migration to FRMCS across the European railway system.
Objective 1: Provide a future proof FRMCS architecture with the necessary telecommunication elements
- 5G SA (Stand Alone) architecture (core and access);
- IMS/SIP-core and MCX;
- TOBA (Telecom On-Board Architecture) equipment;
- Track Side Gateway;
- Cab radio equipment (: Voice Application Subsystem (VAS));
- Dispatcher;
- Monitoring equipment (system and radio);
- ETCS / ATO / TCMS simulators compatible with FRMCS interfaces, including (ETCS) PKI and KMS (national and international), based on H-2-N.
Objective 2: Test the necessary functions of the FRMCS V2 set of specifications
- Voice functions for both drivers and controllers;
- Railway Emergency Communication – REC (Combined REC alert and REC voice);
- Data functions (including ETCS, ATO and TCMS applicative simulations);
- Combination of voice and data applications;
- Location and positioning service (e.g., Railway Emergency Communication, driver to controller communications based on driver’s location) and internal FRMCS System usage (e.g., FRMCS domain change);
- Time service (e.g. timestamp for location reporting of REC);
- Usage of various frequencies: RMR bands (900 and 1900 MHz) and some MNO band(s);
- FRMCS multipath concepts using data paths of MNO and FRMCS/RMR;
- FRMCS inter-domain transition and cross-border testing;
- FRMCS domains interconnection (e.g., communications between users served by different FRMCS Service Domains);
- GSM-R / FRMCS interworking and transition;
- Interoperability between FRMCS components from various manufacturers;
- Quality of Service with performance measurements at system and radio levels;
- Cybersecurity (elements of).
Objective 3: Validation and return on experience
- Provide material elements to confirm / correct / amend / evolve the FRMCS V2 set of specifications;
- Communicate these elements to the UIC FRMCS Programme for the closing of FRMCS V3 set of specifications ahead of update of CCS TSI,