Rail JU logo in white
European Union flag

A body of the
European Union

Deliverable

Deliverable D19.5 Ethics Independent Assessment

This document presents the context in which the collaboration with the Independent Ethical Advisor is taking place. It analyses any ethical issue arising from Work Package (WP) 19 (Exoskeleton and AR for Railway Maintenance) and the way they have been mitigated by the...

Deliverable D 19.1 Workplace analysis and specifications

The aim of this report is to gather all relevant information for the development of successful, innovative, and useful exoskeleton and augmented reality technologies for assistance in railway maintenance operations.

Deliverable D 18.1 Common Framework Orientations

FP3 – IAM4RAIL WP18 was structured around 2 timeframes. In the short-term view, maintenance robots are being developed. Those robots meet business needs expressed by partners. The aims are different: some want to accompany the growth of their transport offer...

Deliverable D17.1 Use cases and specifications

So far, the use of additive manufacturing for the repair of metal components in the railway industry has not yet seen significant adoption. These activities remain mainly labour-intensive and insufficiently industrialised. Therefore, there is considerable room for...

D3.1 Hybrid coupler for dual-use locomotive

D3.1 will describe the installed Hybrid coupler system on the Dual-use locomotive in a detailed report. In particular it will describe the installed system, main functionalities (e.g. folding up/ down, etc.) and the integration of the system into the locomotive....

Europe's Rail