FP1-MOTIONAL D10.1: Mapping against scope, specification of technical enablers, high-level use cases, high-level...
List of Technical Enablers
To achieve the operational outcomes targeted in this Flagship Area, several technical capabilities were identified by FP6. To develop flagship demonstrations, some functions must be delivered with enough maturity, with a target TRL indicated for each enabler.
| FP6 | TE 1 | CCS develop an application for a cost-efficient performant control command and signalling system including:
ATO over ETCS adapted to regional operations hybrid train detection and moving block |
| FP6 | TE 2 | CCS Develop a Operations Control Centre (OCC) covering interlocking, radio blocking and traffic management for regional lines not connected with mainline |
| FP6 | TE 3 | Asset Develop infrastructure components and wayside elements which are energy self-sufficient and/or wireless enabled as well as Smart Wayside Object Controller (SWOC) |
| FP6 | TE 4 | Rolling Stock Concept of modular light-weight vehicle and/or with alternative propulsion system |
| FP6 | TE 5 | Rolling Stock Develop a concept for alternative fuelling/charging stations |
| FP6 | TE 6 | Customer service Develop cost-efficient integration of on-board information of multimodal services |
| FP6 | TE 7 | Customer service develop passenger congestion rate monitoring, flow optimization application as well as a low-cost passenger information system |