Rail JU logo in white
European Union flag

A body of the
European Union

Virtual Demonstrations at the Information Point

The Information Point host a series of presentations and virtual demonstrations from Europe’s Rail Projects. Check them out!

Discover Virtual Demonstrations from EU-Rail projects

Info Point 1 Virtual Demos

Tuesday 22 September

  • 10:30-11:30: Timetable and capacity simulation of new DATO technologies in signalling and train operation + Business case results.
  • 11:30-13:00: Demo Cross Border TMS/CMS.
  • 13:00-13:30: Decision Support for Coordinated Operations in Malmo Freight Yard.
  • 13:30-14:30: Seamless & Inclusive Mobility.
  • 14:30-15:30: Passenger Information System.
  • 15:30-16:30: The European Digital Foundation: Insights in Rail Data Space.
  • 16:30-17:30: Algorithms for rolling stock stabling.

Wednesday 23 September

  • 9:30-11:00: Timetable and capacity simulation of new DATO technologies in signalling and train operation + Business case results.
  • 11:00-12:00: Demo Cross Border TMS/CMS.
  • 12:00-13:00: Algorithms for rolling stock stabling.
  • 13:00-14:00: Seamless & Inclusive Mobility.
  • 14:00-15:00: Passenger Information System.
  • 15:00-16:00: The European Digital Foundation: Insights in Digital Twin Environments.
  • 16:00-17:00: Decision Support for Coordinated Operations in Malmo Freight Yard.

Thursday 24 September

  • 9:30-10:30: Timetable and capacity simulation of new DATO technologies in signalling and train operation + Business case results.
  • 10:30-11:30: Demo Cross Border TMS/CMS.
  • 11:30-12:00: Decision Support for Coordinated Operations in Malmo Freight Yard.
  • 12:00-13:00: Seamless & Inclusive Mobility.
  • 13:00-14:00: Algorithms for rolling stock stabling.
  • 14:00-15:00: The European Digital Foundation: Insights in ETCS Planning and Validation.
  • 15:00-16:00: Passenger Information System.
Info Point 2 Virtual Demos

Tuesday 22 September

  • 10:30-11:30: Hybrid Train Detection.
  • 11:30-13:00: Remote Train Operation in the Netherlands.
  • 13:30-14:00: ASTP presentation.
  • 14:00-14:30: General architecture approach.
  • 14:30-15:30: Short Range Communication and Relative Localization: Development and Demo Results.
  • 15:30-16:00: ATO Simulation results.
  • 16:30-17:30: ATO GoA 3/4 Live Demonstration and Validation in Czechia Based on R2DATO Specifications.

Wednesday 23 September

  • 9:30-10:00: ASTP presentation.
  • 10:00-11:00: Modular Platform Results, demonstrations and Outlook.
  • 11:00-12:00: Hybrid Train Detection.
  • 12:00-12:30: Automation Processes Cluster – From use cases to demos.
  • 14:00-15:00: Towards a Dynamic and Efficient CCS for Europe.
  • 15:00-15:30: RTO in NL.
  • 15:30-16:00: ATO Simulation results.
  • 16:00-16:45: Short Range Communication and Relative Localization: Development and Demo Results.
  • 16:45-17:15: Certification Platform test.

Thursday 24 September

  • 9:30-10:00: RTO in NL
  • 10:00-11:00: Modular Platform Results, demonstrations and Outlook
  • 11:00-11:30: Multiconnectivity platform
  • 11:30-12:30: Towards a Dynamic and Efficient CCS for Europe
  • 12:30-13:30: ATO GoA 3/4 Live Demonstration and Validation in Czechia Based on R2DATO Specifications
  • 13:30-14:30: Automation Processes Cluster – From use cases to demos
  • 14:30-15:00: Certification Platform test
  • 15:00-16:00: ASTP presentation
Info Point 3 Virtual Demos

Tuesday 22 September

  • 10:30-11:00: Demonstrator of the use of Blockchain technology to enhance traceability, authenticity and management of railway infrastructure certifications.
  • 11:30-13:00: IAMS Platform for wayside monitoring and TMS optimisation.
  • 13:30-14:00: Demonstration of automatic track visual inspection by unmanned means (drones).
  • 14:30-15:00: Bim model as support to communicate and populate the Station’s Asset Management System.
  • 15:30-16:00: Bim model as support to communicate and populate the Station’s Asset Management System.
  • 16:30-17:00: Prescriptive maintenance for railway infrastructure (UC 9.4 DB).

Wednesday 23 September

  • 9:30-10:00: Demonstrator of the use of Blockchain technology to enhance traceability, authenticity and management of railway infrastructure certifications.
  • 10:30-12:00: IAMS Platform for wayside monitoring and TMS optimisation.
  • 12:30-13:00: Demonstration of automatic track visual inspection by unmanned means (drones).
  • 13:30-14:00: Demonstration of automatic track visual inspection by unmanned means (drones)
  • 14:30-15:00: Bim model as support to communicate and populate the Station’s Asset Management System.
  • 15:30-16:00: Prescriptive maintenance for railway infrastructure (UC 9.4 DB).
  • 16:30-17:00: IAMS Platform for wayside monitoring and TMS optimisation.

Thursday 24 September

  • 9:30-10:00: Demonstrator of the use of Blockchain technology to enhance traceability, authenticity and management of railway infrastructure certifications.
  • 10:30-12:00: IAMS Platform for wayside monitoring and TMS optimisation.
  • 12:30-13:00: Demonstration of automatic track visual inspection by unmanned means (drones).
  • 13:30-14:00: Demonstrator of the use of Blockchain technology to enhance traceability, authenticity and management of railway infrastructure certifications.
  • 14:30-15:00: Bim model as support to communicate and populate the Station’s Asset Management System.
  • 15:30-16:00: Prescriptive maintenance for railway infrastructure (UC 9.4 DB).

Thursday on VR/AR corner

13:30-16:00: IAMS Platform for wayside monitoring and TMS optimisation.

Europe's Rail