The process flow for European seamless rail freight and a future automated full digital freight train operation with all relationships must be described within its physical (such as locomotive/wagon and its subsystems) and a digital (data) layer as a foundation for the specification of the requirements of the technical enablers for a digital-rail-based logistic systems. Target operational processes for all areas in all relevant scenarios (situations/sites/locations) shall be defined.
A common approach for fully functional interoperable and homologated Digital Freight Train Operation (FDFTO) shall be ensured by means of a fully integrated reference system architecture comprising of the various technological advances and developments of the project. The system architecture shall build a foundation for all interconnected tasks: requirement management, variant management, validation tests, RAMS analysis. The work package aim is designing and harmonization of a functional reference system for the FDFTO architecture with a focus purely on functionality not on the technical solution: Both a physical reference system architecture (layout of physical entities and interfaces) and a digital reference system architecture (data and digital interface design).
The main objective of WP4 is to prepare the procedures and the necessary requirements for vehicle authorisation to bring DAC up to functional Level 5 into the EU railway system. This includes procedures and requirements to assess and certify the DAC as well as procedures and requirements to assess the integration of the related energy provision, vehicle control and train functionalities into (new or retrofitted) freight wagons and locomotives.
The main objective of WP6 is reaching a full compatibility and EU-interoperability of DAC Level 4 of functionality. WP6 partners will provide interoperable DAC Level 4 systems. The aim is to test and demonstrate the interoperability of the systems in laboratory environments & provide qualified technology for train tests under controlled environment and large-scale validation and demonstration with TRL8.
The main objective of WP7 is reaching a full compatibility and EU-interoperability of DAC Level 5 readiness functionality. WP7 partners will provide interoperable DAC Level 5 ready couplers based on the upgrade of WP6 DAC Level 4 couplers. The aim is to test and demonstrate the interoperability of the couplers in laboratory environment & provide qualified technology for train tests under controlled environment and large-scale validation and demonstration.
The aim of WP13 is to support and coordinate WP14-21 by providing a test concept, system integration plan and holistic FDFTO assessment. The objective of WP13 is to ensure integration of the technical enablers to a functional FDFTO train and delivery of the demonstrators.
The objective of WP14 – Train Test Lab is to enable and execute the validation of the FDFTO requirements in a centralized FDFTO lab and in a harmonized way. The aim is to establish a joint, cocreational, one-of-its-kind environment for the project and the railway freight sector to move up across the envisaged TRLs in a cost-efficient and effective way. Test procedures of the technical enablers, both on component/subsystem and on train level, according to the developed validation and test plan shall be possible. By using the train test lab specific operational procedures can be pre-tested, and on the other hand retrofitting efficiency, maintainability and serviceability assessments shall be possible. Also, developer- tests will be carried out to ensure the suitable system-approaches for the FDFTO-energy- and communication-system for locomotives and wagons.
The WP15 main objectives are:
Testing and validation of DAC and selected enablers (e.g., EP-brake, train composition, automated brake test etc.) in harsh winter conditions with low temperatures down to – 25 degrees Celsius (T1), a lot of snow and snow smoke adverse weather conditions. This will contribute to input and data for LCC analysis of DAC, full interoperability, and the functionality of the selected enablers (e.g., EP-brake, train composition, brake test etc). The WP16 will set up three (3) demo trains in these DAC tests and selected train functions (e.g., EP-brake, train composition, automated brake test). (TRL8)
Based on the foundation provided by the EDDP WP1 SG 3, Powerline PLUS is one of two shortlisted communication technologies for the data backbone of the future freight train. The primary focus from FP5 will be on the technology SPE, due to the limited resources in the project and the challenging time plan. As none of the technologies has been fully tested and qualified in the target environment and to minimize the risk in the project, it´s recommended to continue the development and testing with both technologies, meanwhile in parallel. If Powerline PLUS will be selected instead of SPE it needs to be further pursued, in this WP an interoperable Powerline plus based DAC communication systems, will be brought to a higher maturity (TRL8), and integrated into ERJU demonstrators. The aim is to provide standardized interoperable set of solutions. The functionality and performance shall be demonstrated and validated against the requirements and documented in test-reports for interoperability readiness. Mechanical, electrical, and SW integration into rail vehicles shall be made possible by providing integration instructions and required documentation of the individual components and sub-systems. (TRL8)
The objective of this work package is to support EDDP. This work package aims at providing input for the EDDP CBA work package. ERA involvement will be actively requested for validation purposes, so values can be accepted for a global CBA.
Currently available deliverables:
All deliverables, results and publications herewith provided reflects only the author's view and the EURAIL is not responsible for any use that may be made of the information it contains.