Europe’s Rail December 2024 newsletter is here, packed with the latest updates from the European rail research and...
Cover Document
Deliverables
Phase 4 – Requirement Specifications
- Generic interface and subsystem requirements
- Generic requirements for SCI
- Maintenance and data management specification
- Requirements specification for subsystem Generic IO
- Requirements specification for subsystem Light Signal
- Requirements specification for subsystem TDS
- Generic requirements for SMI
- Requirement specification for subsystem Point
- Requirements specification for subsystem Level Crossing
Phase 5 – Interface Specifications
SCI
- Interface specification SCI-LC
- Interface definition SCI
- Interface specification SCI-IO
- Interface specification SCI-LS
- Interface specification SCI-P
- Interface specification SCI Generic
- Interface specification SCI-TDS
SDI
- Interface definition SDI
- Interface specification SDI-IO
- Interface specification SDI-LC
- Interface specification SDI-LS
- Interface specification SDI-P
- Interface specification SDI-TDS
- Interface specification SDI Generic
SMI
Requirements database
Models
Simulators
- Simulator Explanation Note
- Simulator Subsystem Generic IO
- Simulator Generic Adjacent System
- Simulator Generic Fieldelement Subsystem
- Simulator Subsystem TDS
- Simulator Subsystem LS
- Simulator Subsystem Level Crossing
- Simulator Subsystem Point 4W
- Simulator Subsystem Point Non4W
The documents have been prepared for EU-Rail, however, they reflect the views only of the authors, and EU-Rail is not liable for any consequence stemming from the reuse of these publications.