Rail JU logo in white
European Union flag

A body of the
European Union

Deliverable

D6.6-Specification of Passenger congestion monitoring

This deliverable is developed as part of Task 6.5 within Work Package 6 (WP6) of the EU-Rail FP6 FutuRe project, a strategic initiative aimed at revitalizing regional railway networks across Europe. WP6 is dedicated to the specification phase, laying the groundwork...

FP5-TRANS4M-R D2.1 Preliminary Operational Procedures V2

This document constitutes Deliverable 2.1 Preliminary Operational Procedures of ER JU Flagship Area 5 project FP5-TRANS4M-R. The document reports results from task 2.1 Target operational procedure description. The project aims to boost innovation for the European rail...

Europe's Rail